Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative (EVAFIDI)


16.jpg

NRCan’s repayable contribution through this Program will be limited to a maximum of five million dollars ($5,000,000) per project.For EV fast chargers (from 50 kW power output and above), the Program will pay up to 50% of the total project costs to a maximum of fifty thousand dollars ($50,000) per fast charger.

The following EV chargers are also eligible for funding if placed with a level 3 fast charger as a supplementary charging option at the same site:


408.jpg

For EV fast chargers (from 20 kW to 49 kW power output), the Program will pay up to 50% of the total project costs to a maximum of $15,000 per fast charger.

rsz_1rsz_249.jpg

For Level 2 (208 / 240 V from 3.2 kW to 19.2 kW power output) EV chargers, the Program will pay up to 50% of the total project costs to a maximum of $5,000 per connector.

O7MEZA0.jpg

EVAFIDI submission deadline to NRCan is July 23, 2020.