british columbia workplace Rebates

Up to 50% of purchase and installation costs of eligible, new, Level 2 charging equipment, to a maximum of $14,000 (no more than $2,000 per station). Pre-approval is required.

Eligible condos, apartments and workplace organizations can have separate applications for different sites, up to a maximum of four.

Workplaces need to be pre-approved for a rebate. This includes building owners, managers, strata councils, B.C.-registered companies, or other building representatives who are responsible for an eligible condo, apartment, workplace, or building in B.C. Once pre-approved for an incentive, applicants must purchase and install eligible EV charging equipment, and complete applications within four months or by September 30, 2020, whichever comes first.

ELIGIBLE COSTS

The eligible costs associated with a multi-unit charging station are:

  • Purchasing the charging station

  • Labour and construction costs for installation of the charging station and associated conduit

  • Site assessments including analysis of electrical capacity, review of panel capacity and infrastructure, and identification of design options

  • Electrical and related permits

  • Parking and electrical design required by the charging stations and conduit

  • EV parking signage

ELIGIBLE CHARGERS

Charging stations that are eligible for the rebate must be:

  • Purchased in B.C. and not leased

  • Approved for sale and use in Canada and have cUL, cETL, and CSA certifications

  • A Level 2 charger, 208 volt or 240 volt, with a standard "J plug" (J1772)

  • A permanent installation

  • Networked: connected to a central system via Internet communication such as open protocol (e.g. OCPP, Open ADR or other) or a proprietary system

REQUIRED DOCUMENTATION

To apply for pre-approval, the applicant must provide: