british columbia multi-unit building Rebates
Condo and apartment rebates depend on when the building was constructed with respect to municipal bylaws requiring EV-ready parking stalls. Pre-approval is required.
Constructed prior to municipal bylaws: Up to 50% of purchase and installation costs of eligible, new, Level 2 (208-volt or 240-volt) charging stations or energized outlets to a maximum of $14,000 (no more than $2,000 per station). Dual-port stations count as two.
Constructed after municipal bylaws: Up to 50% of purchase and installation costs of eligible, new, Level 2 (208-volt or 240-volt) charging stations to a maximum of $5,000 (no more than $350 per station). Dual-port stations count as two.
Eligible condos, apartments and workplace organizations can have separate applications for different sites, up to a maximum of four.
Condos, apartments and workplaces need to be pre-approved for a rebate. This includes building owners, managers, strata councils, B.C.-registered companies, or other building representatives who are responsible for an eligible condo, apartment, workplace, or building in B.C. Once pre-approved for an incentive, applicants must purchase and install eligible EV charging equipment, and complete applications within four months or by September 30, 2020, whichever comes first.
ELIGIBLE COSTS
The eligible costs associated with a multi-unit charging station are:
Purchasing the charging station
Labour and construction costs for installation of the charging station and associated conduit
Site assessments including analysis of electrical capacity, review of panel capacity and infrastructure, and identification of design options
Electrical and related permits
Parking and electrical design required by the charging stations and conduit
EV parking signage
ELIGIBLE CHARGERS
Charging stations that are eligible for the rebate must be:
Purchased in B.C. and not leased
Approved for sale and use in Canada and have cUL, cETL, and CSA certifications
A Level 2 charger, 208 volt or 240 volt, with a standard "J plug" (J1772)
A permanent installation
Networked: connected to a central system via Internet communication such as open protocol (e.g. OCPP, Open ADR or other) or a proprietary system
REQUIRED DOCUMENTATION
To apply for pre-approval, the applicant must provide:
Quote of work
Business license, strata status or non-profit status